Request behavior is configured in two places. Organization-wide settings live at Access > Request Settings. Everything else is set per resource, at Access > Resources, on the resource's tabs. This page lists the controls in both and says what each one changes. Step-by-step instructions for the resource tabs are in Resources and access.

ScopeWhereWhat it controls
OrganizationRequest Settings > Timing & SLADue dates, reminders, escalation, expiry, lifetime ceiling
OrganizationRequest Settings > ApprovalsManager fallback
ResourceApproval tabStages, approvers, stage policies, timing override
ResourceFulfillment tabWho or what fulfills approved requests
ResourceDetails tabAccess duration, approval sequencing, emergency access
ResourceForm tabThe request form

Timing & SLA​

Access > Request Settings > Timing & SLA has one section per phase, Approval and Fulfillment, each drawn as a timeline you adjust, and a third for the Request lifetime ceiling. The two sentences at the top of the page restate the current settings in words.

Phase controls​

Both phases have the same controls. Timing starts when the phase becomes active. For approval, that is when a stage opens. For fulfillment, it is when the item enters fulfillment.

ControlValuesDefault (approval / fulfillment)Effect
Due date1 to 365 days after the phase starts7 / 7Sets the due date on the stage's steps and on tickets.
Due-soon remindersUp to 5, each a whole number of days before due3 and 1 / 3 and 1Sends a reminder that many days before the due date. Remove all of them for none.
Overdue reminder interval1 day or more3 / 3Days between reminders once overdue.
Overdue reminder cap0 to 103 / 3Most overdue reminders sent. 0 sends none.
Escalation switchOn or offOn / OnTurns escalation for the phase on or off.
Escalation point1 day or more after the due date3 / 3When the escalation action runs.
When it escalatesSee the next tableReassign up the manager chain / Notify resource ownerWhat escalation does.
Expiry1 day or more after the due date, or Never expire automatically14 / neverCancels the item if it is still waiting.

Expiry must be later than the escalation point when both are on.

Escalation actions​

PhaseActionExtra fieldEffect
ApprovalReassign up the manager chainNoneMoves each overdue approval to its holder's manager, again at each further interval, up to 10 levels. Ends at the manager fallback.
ApprovalReassign to…Target: a user or groupMoves each overdue approval to the target.
ApprovalFunction…Function: an approval functionRuns the function. An assign result moves the approval.
ApprovalAlert adminsNoneRaises an alert for administrators.
FulfillmentNotify resource ownerNoneSends an escalation notice to the resource's owner.
FulfillmentNotify…Target: a user or groupSends the notice to the target.
FulfillmentAlert adminsNoneRaises an alert for administrators.

A group target gets email for up to 20 randomly chosen eligible members per notification. Choose a smaller group if everyone must be emailed.

Request lifetime ceiling​

ControlValuesDefaultEffect
EnableOn or offOnWhen on, a request still open at the ceiling is closed, whichever phase it is in.
Ceiling1 day or more90 daysMeasured from submission.

The page shows the shortest a request can run with your current settings, one approval stage plus one fulfillment step, and warns when the ceiling is shorter than that. Flows with several stages need more room, because each stage gets its own due date.

Saving and resetting​

  • Save timing stores your changes as the organization's timing.
  • Undo discards unsaved changes.
  • Reset to system defaults removes the organization's timing so the defaults above apply again. Resource overrides aren't affected.

Timing is copied onto each item when its request is processed. A change applies to requests processed afterward. Items already in flight keep the timing they started with. To give one of them more time, use Extend due date on the request.

Approvals: manager fallback​

Access > Request Settings > Approvals has one setting, Manager fallback, with the field Fallback behavior.

ValueExtra fieldEffect
The resource's ownerNoneThe requested resource's owner approves. It errors when the resource has no owner, or the owner is the person it's for. The default.
Let the request errorNoneA manager approval with no usable manager errors.
Reassign to a specific userA userThat person receives approvals that can't be routed to a manager.
Reassign to a specific groupA groupMembers of that group can handle those approvals.

Select Save approval settings to apply. A user or group is required for the two reassign values.

The fallback is used in three places:

  • when a Manager approver or a function's manager assignment finds no active manager
  • when manager-chain escalation reaches the top
  • when a leaver's approvals are handed over and they have no active manager

A change applies to new requests, and to an errored request when you re-process it.

Resource: Approval tab​

Stages​

ControlValuesDefault for a new stageNotes
Add stageAdds a stage at the endStages run top to bottom. Reorder with the handle or the arrows.
Stage policyAll approvers, Any approver, At least N of MAll approversHow many approvals the stage needs.
Quorum1 up to the number of approvers2, or 1 with one approverShown for At least N of M only.
Allow rejections while approval is still possibleOn or offOnShown for At least N of M only. Off means the first rejection fails the stage.
Add approverAdds an approver to the stageA stage needs at least one.
Approver typeAuto Approve, Manager, App Owner, User, Group, FunctionAuto Approve for the first approver of a new stage, User for added onesUser, Group and Function need a selection.
CopyCopies another resource's approval flowReplaces this resource's stages with a copy.

All approvers always fails on the first rejection and Any approver always waits until every approver has rejected. Those two behaviors aren't configurable.

For what each approver type and policy does at runtime, see Approval routing and decision rules.

Timing override​

Under Timing, turn on Override to give this resource its own values for any of the phase controls or the ceiling. Anything left blank inherits the organization's setting.

ControlValues
Due afterDays from phase activation.
Due-soon remindersComma-separated days, largest first. Blank inherits. A separate option overrides with none.
Overdue cadenceDays between overdue reminders.
Overdue reminder capSet 0 to disable overdue reminders.
EscalationInherit tenant setting, No escalation, Escalate
Escalate after overdueDays past due before escalation.
Escalation actionThe same actions as the organization setting, with a Target or function where needed.
ExpiryInherit tenant setting, Never expire automatically, Expire after overdue
CeilingInherit tenant setting, No overall ceiling, Close after a maximum duration

Choosing Escalate on a resource replaces the organization's escalation for that phase entirely, including its action. The same validation applies to the combined result, so an override can't put expiry before escalation.

When approval changes take effect​

For standard requests, Owlie builds an item's approval steps when the request is first processed. Editing the stages afterward doesn't change steps that already exist on open requests. If an item is in Approval Error and you re-process it, the errored steps and any steps that hadn't started are rebuilt from the current flow. That is how a fix to a broken flow reaches a stuck request.

Provisional and emergency requests freeze the whole flow at submission.

Resource: Fulfillment tab​

Fulfillment typeExtra fieldEffect
VirtualNoneOwlie completes the approved request without handing work to anyone.
Specific userA userOpens a fulfillment ticket for that person.
Group membersA groupOpens a fulfillment ticket that any member can complete.
FunctionA functionRuns your fulfillment function.
Connector integrationAn installed integrationProvisions through the connector.

The fulfiller is resolved when a request is first processed. A missing user or group puts the item in Fulfillment error. See Manual fulfillment.

Resource: Details tab​

These sections affect request processing. Other sections on the tab are covered in Resource configuration reference.

Access duration for requests and direct grants​

Not shown for task resources.

ControlValuesDefaultEffect
Permanent accessAllowed, ForbiddenAllowedWhether a grant may have no end date.
Default duration (minutes)Whole minutes, or emptyEmptyApplied when no end is requested and one is required.
Maximum duration (minutes)Whole minutes, or emptyEmptyRequests and direct grants can't exceed it.
Requester may choose a shorter durationOn or offOffLets the requester set an end time, within the maximum.
Requester may schedule a future startOn or offOffLets the requester set a start time. Otherwise the duration begins when provisioning starts.

A resource with no access-duration settings saved doesn't restrict the start or end a requester chooses. See Access windows and expiration.

Approval Sequencing​

ControlValuesDefault
When access beginsApprove before access begins, Grant trusted repeat access before ratificationApprove before access begins
Ratification deadline (minutes)1 or more. Shown for the second value.
Failure cooldown (hours)0 or more. Shown for the second value.

Emergency access​

Off until you turn on Enable.

ControlValuesOffered default
Maximum duration (minutes)1 or more60
Ratification deadline (minutes)1 or more30
Failure cooldown (hours)Hours, or empty for noneEmpty
Who may invoke itPeople, groups and identity filters, with exceptions
Who may receive itPeople, groups and identity filters, with exceptions
How it may be invokedFor themselves, As the beneficiary's manager, For any selected beneficiary
Create post-event owner certificationOn or offOn

See Provisional and emergency access.

What is frozen on a request​

SettingRead whenEffect of a later change on open requests
Request form and answersSubmissionNone.
Selected Grants and access windowSubmissionNone.
Provisional or emergency eligibility and deadlineSubmissionNone.
Approval flow, standard requestFirst processingNone for existing steps. Rebuilt steps use the new flow.
Approval flow, provisional or emergencySubmissionNone.
TimingFirst processingNone. Use Extend due date.
FulfillerFirst processingApplies when an errored item is re-processed.
The beneficiary's managerWhen the stage opens or escalation runsA manager change before then is used.
Manager fallbackWhen a manager can't be foundApplies to errored requests when they are re-processed.
Deny policiesThe policy gate, after approvalApplies. An approved exception covers only the policy versions the approver saw.

Permissions​

To do thisYou need
Change Request SettingsPermission to modify settings (settings.modify).
Change a resource's approval, fulfillment, form or access settingsPermission to modify resources (resource.modify).
Re-process, cancel, reassign or extend any requestPermission to modify requests (request.modify).
Act on any ticketPermission to act on tickets (ticket.action).
Approve a policy exceptionPermission to approve policy exceptions (policy.exception.approve).

People without these permissions can still work the requests they are part of: requesters and beneficiaries can view and cancel their own requests, and assignees can act on their own tickets. See Role and permission reference.