Create and schedule a campaign
A campaign is a reusable template: it defines who and what to review, under which policy and timing. Each run of the campaign reviews the access that matches its scope at that time. You create a campaign once, then create runs by hand or on a schedule.
You need permission to manage review campaigns. Setting a campaign's review policy also requires permission to manage review policies.
Create the campaign
-
Open Governance > Campaigns and select New campaign.
-
Choose the Campaign kind.
- Certification routes each item to reviewers from the review policy and produces exportable evidence.
- Attestation asks each access holder whether they still need the access. It is not certification evidence.
You cannot change the kind after you create the campaign. How access reviews work compares the two.
-
Enter a Name, and optionally a Description.
-
Optionally set Due offset, in whole days. Each run is then due that many days after it is created, counted as elapsed 24-hour days. Leave it empty for runs with no due date. No review item in a run expires later than the run's due date.
-
Set the scope under Who is reviewed and What is reviewed. Scope and reviewer routing describes each control. With no terms, the campaign covers every user and every resource.
-
To give this campaign its own reviewers, stages or reason requirements, select Override policy. To change its due window, reminders, escalation or expiry, select Override timing. Leave both alone to use each Grant's inherited policy and the tenant timing.
-
Select Create campaign.
Creating a campaign does not start a review. It saves the template and opens it with five tabs: Overview, Scope, Policy, Schedule and Runs. To change the template later, edit a tab and select Save template.
Create a draft run
On the campaign's Runs tab, select Create draft. Owlie creates a numbered run in the Draft state, copying the template as it is at that moment. Editing the template afterward does not change runs that already exist.
A draft creates no review items and no reviewer sees anything yet.
Check a draft before launch
Open the draft run. It shows two previews of what launching would do.
The scope preview counts what the scope matches now:
- Items in scope: the number of review items the launch would create.
- Identities, Resources and Grant targets: how many distinct ones are involved.
- Coverage: the targets reached by propagating Grants in the sample. One item for a propagating Grant covers every target below it, and overlapping Grants can count the same target twice.
- Resources in scope: the resources with the most items.
- Example grants: sample rows, each with the person, the resource and the Grant.
For a large scope the statistics are calculated from a sample, and the preview says so, for example "Stats from 2,000 of 14,500 grants". Items in scope is always the full count.
Reviewer load estimates how many first-stage items each reviewer would receive (New), alongside what they already have open (Pending). Look for a reviewer with far more items than the rest, and for rows marked Unresolved, where no reviewer could be found. Fix unresolved routes in the review policy or the fallback setting before you launch.
If the scope matches more than 50,000 items, the preview warns that the campaign exceeds the maximum launchable size and the launch is refused. A scope that matches nothing is refused too. Go back to the campaign's Scope tab, narrow or widen the scope, and create a new draft.
To estimate what revokes would do, the GraphQL API offers the simulateReviewRemediation query. For
a campaign or a scope, it counts:
- how many items would be remediated automatically, manually or not at all
- how the removal would be carried out
- how many would be held because automation assigned the access
It creates nothing.
Launch the run
Select Launch campaign and confirm. A launch cannot be undone. You can only cancel the run afterward.
The run moves through these states:
| State | Meaning |
|---|---|
| Draft | Not launched. You can launch it or select Delete draft. |
| Generating | Owlie is creating the review items. The tenant review policy is frozen for this run at this point. |
| Active | Generation finished. Reviewers are working through the items. |
| Completed | Every item reached a final state. |
| Cancelled | The run was cancelled. |
| Failed | Generation failed before the run became active. |
Generation takes time for a large scope. Wait for Active before you assume every item exists. An active run shows Items in campaign, Needs remediation, and breakdowns By status and By outcome. View campaign items opens the item list filtered to the run.
Each reviewer receives one campaign notification when their first assigned item becomes available, including reviewers assigned in a later stage. They find all assigned items under Reviews. Individual campaign items do not send separate assignment notices or reminders.
Cancel or archive a run
Cancel run is available while a run is generating or active. It cancels every item that is not yet decided, and reviewers no longer see them. Items already decided are kept as they are.
A completed, cancelled or failed run can be archived, which removes it from the lists. Its review items and decisions are kept.
Schedule runs
Open the campaign's Schedule tab and turn on Run on a schedule. Set Every, Unit (Days, Weeks or Months), First run (local time) and Time zone. Then choose When each occurrence fires:
- Mint and launch automatically creates a run and launches it at once. If the launch is refused, for example because the scope is empty or too large, Owlie keeps the run as a draft and notifies the campaign owner.
- Mint a draft and notify the campaign owner creates a draft and notifies the owner, who can check the previews and launch it.
Check Estimated next run, then select Save schedule. The schedule is saved separately from the rest of the template. Each occurrence uses the template as it is when that run is created.
The first run must be a real local time in the selected zone. If the time occurs twice when clocks move back, choose First occurrence or Second occurrence under Repeated local time. The saved choice also applies to later repeated times. If a future clock change removes a scheduled local time, Owlie skips that occurrence.
Monthly schedules are calculated from the first run's day of the month, so they return to it after a shorter month. A schedule starting January 31 runs on February's last day and then on March 31.
The time zone is saved with each run. Changing your profile time zone changes how times display for you. It does not move a saved campaign run.
To stop scheduled runs, turn off Run on a schedule and select Save schedule. You can still create a draft by hand.
Archive a campaign
On the Overview tab, select Archive campaign. The template leaves the campaigns list. Runs it already created keep their data.